{"id":11789,"date":"2024-11-11T15:37:59","date_gmt":"2024-11-11T15:37:59","guid":{"rendered":"https:\/\/lewishamcyclists.org.uk\/?p=11789"},"modified":"2024-11-11T16:00:46","modified_gmt":"2024-11-11T16:00:46","slug":"deptford-church-street-cycle-lanes-under-construction","status":"publish","type":"post","link":"https:\/\/lewishamcyclists.org.uk\/deptford-church-street-cycle-lanes-under-construction\/","title":{"rendered":"Deptford Church Street – Cycle Lanes under construction"},"content":{"rendered":"\n
\"\"<\/a><\/figure>\n\n\n\n

After a long time waiting for Thames Water to complete their Tideway SuperSewer works you may have observed Conway are now hard at work re-constructing the whole of Deptford Church Street between Deptford Bridge and Creek Road. The new design will be a single carriageway road with fully segregated cycle lanes and a much improved public realm with more space for pedestrians plus environmentally friendly rain gardens. The hazardous roundabout outside the Bird’s Nest pub will be replaced by a signalised junction.<\/p>\n\n\n\n

These cycle lanes will feed directly into Cycleway 4, fully opened all the way to Tower Bridge earlier this year, to make a totally segregated main road cycle route from Deptford Bridge to Tower Bridge.<\/p>\n\n\n\n

Full marks to Lewisham Council for taking up our ideas for this road and turning them into reality thus taming this outdated and hazardous dual-carriageway.<\/p>\n\n\n\n

These are extensive works so will go on for a number of months, hopefully we’ll see completion in time for summer.<\/p>\n\n\n\n

Our next campaign objective is to persuade Lewisham to extend these lanes along Brookmill Road for a direct route all the way to Lewisham.<\/p>\n","protected":false},"excerpt":{"rendered":"

After a long time waiting for Thames Water to complete their Tideway SuperSewer works you may have observed Conway are now hard at work re-constructing the whole of Deptford Church Street between Deptford Bridge and Creek Road. The new design will be a single carriageway road with fully segregated cycle lanes and a much improved… Read More »Deptford Church Street – Cycle Lanes under construction<\/span><\/a><\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","activitypub_content_warning":"","activitypub_content_visibility":"","footnotes":""},"categories":[32,47,33,36,1],"tags":[],"_links":{"self":[{"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/posts\/11789"}],"collection":[{"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/comments?post=11789"}],"version-history":[{"count":6,"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/posts\/11789\/revisions"}],"predecessor-version":[{"id":11798,"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/posts\/11789\/revisions\/11798"}],"wp:attachment":[{"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/media?parent=11789"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/categories?post=11789"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lewishamcyclists.org.uk\/wp-json\/wp\/v2\/tags?post=11789"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}